Allwin Engineering Key Personals References from Middle
East on Pre commissioning projects:
The Allwin Engineering key personals have done the
below projects in Kingdom
of Saudi Arabia. All the
technical manpower within Allwin Engineering are qualified and experienced in
Oil & Gas industry for years to assure best quality services to Australian
and Far East Asian clients.
All the below contracts are with MMG Technical Services Division in Saudi Arabia which is a Service
provider division of one of the largest Construction company in the Middle East
§ Aqua Milling
cleaning of pipe spools & preservation for major de bottleneck project for Saudi Chevron Phillips during Feb 2007,
October 2007 –AYTB as the construction contractor.
§
Performed
Pre commissioning activity for Samsung Saudi Arabia Ltd, for their project of
EO / EG Plant at Sharq 3rd Expansion
Project. Foster Wheeler is the FEED & EPC which includes Passivation of
Cooling water system, Bolting & mechanical run check and preparation.
§
Chemical
Cleaning of Oxygen lines for Jubail United
Petrochemical company JUPC –EO EG plant II and Aqua milling cleaning of Oxygen
import line from EG I.
§ Carried out
Hydraulic Bolt torquing and tensioning requirements
of the entire project, completed in schedule, maintained complete data base of
the joints, ensuring joint integrity and Achieved
‘Zero’ % leak at two major projects for Jubail United
Petrochemical Company – SATEC -EO /EG
Phase 2 and LINARCO – LAO Project
§ Successfully
completed Columns modification job which includes retraying
in 7 columns with Sulzer high performance trays and
shut down jobs for Major Turn Around at Saudi Chevron Phillips, Jubail. during Feb 2007 with 42 engineering days based
on the major columns modification works. This project is a part of the major
modification and debottlenecking of existing old Aromax
complex.
§ De contamination
of the columns and vessels in Saudi Chevron Phillips during shut down
Feb 2007, October 2007 reduces the gas freeing and release for maintenance 50%
less time.
§
Chemical
cleaning & Passivation of
Cooling water lines for United LAO, Sharq –Samsung –3rd
Expansion EG plant, Yansab EG Phase 1.
§
Pre
commissioning works for Saudi
Aramco GOSP 1, Qatif
Producing Facilities. As a Contractor for Pre Commissioning to Snamprogetti
S. p. A. Milanese, Italy.
Planning and Work Package Preparation and the Pre
commissioning work
Prepared Checklist & Forms for Precommissioning
and Site acceptance and inspection for startup.
The GOSP 1 consists of Gas Oil Separation Plant, Water
Oil Separation Plant, Water Injection Plant, Gas Gathering Plant and Utilities.
§
Provided
Manpower assistance for commissioning and startup, Aqua
milling, Chemical cleaning and maintenance requirements for Saudi Aramco
Qatif facilities at Berri
Gas Plant –Sulfur Recovery Units Expansion
and Modification Sub contractor for Technip Saudi Arabia Ltd.
§
Aqua
Milling of big bore lines, Chemical Cleaning and Oil Flushing works of Lube oil
circuit of WIP pumps and Gas compressors for Saudi Aramco Qatif facilities GOSP 2 Qatif South as a Subcontractor for Arabian CBI Ltd.
§
Completed
Turnaround maintenance Job in January 2008 T/A for Safco
IV –one of the world largest Ammonia Plant –Saudi Arabian Fertilizers Company,
Jubail. KSA.
§
Completed
Revalidation of Hi Flow rate gas well flow lines for Hawiyah
and Kuff gas area for Saudi Aramco.
§
Shut
down maintenance job at Saudi Aramco
Riyadh Refinery -April 2005 for the plants LPG, Vise
breaker, DGA, Sulfur, Desulphurization and Hydrogen
plants.
§
Shut
down maintenance job at Saudi Aramco
Riyadh Refinery -Feb 2007 for the plants LPG, Vise
breaker, DGA, Sulfur, Desulphurization and Hydrogen
plants, with critical mile stone for about 40%
tubes replacement for platformate heater
–completed 2 days ahead of schedule on primary plan
§
Completed
Turn around for Shedgum Gas plant for Saudi Aramco – Aug 2006.
§
Shut
down maintenance job at Saudi Aramco Rastanura South Refinery -April 2004 for the 5 plants
including Vise breaker, DGA, Sulfur,
Desulphurization and Hydrogen plants.
Barrup Fertilizers Pty Ltd . - Barrup Peninsula, Karratha,
WA
The Allwin Engineering performed Rigging and closure
of Ammonia Converter, performed Bolt tensioning and Torque requirement of the
project during construction of one of the biggest single train Ammonia plant in
Burrup Peninsula, Western Australia.
The Performance and professional work of PSS bagged
the long term Maintenance Contract from BFPL, which includes, General
Mechanical, Electrical Maintenance works, Scaffolding, Coating and insulation
works. This job is being carried out by another entity ATS AP Pty Ltd. -Owned
and Managed by the same Management.
The Allwin Engineering performed maintenance and
repair activity on an Emergency shutdown during April 2008, due to break down
for 4 days.
The Allwin Engineering has been awarded with Total
Turnaround Management for BFPL planned Major Shutdown and Allwin Engineering
completed the shut down during June 2008
The ATS WA Pty Ltd, has been awarded for managing the
emergency shutdown of the BFPL plant due the major broke down maintenance of
the Main air compressor of the Ammonia plant.
Construction of New
Desalination plant for Burrup Fertilizers, Dampier, WA 6713.
The New Desalination Plant will supply water to the
plant replacing the water supply from Water Corporation with a capacity of 1500
M3 each skid per day
capacity. The Desalination plant consists of 2 Nos skid mounted units, 3 nos of
Booster pumps, MCC, PLC control systems supplied by Entropie
SAS, France.
This is a brown field project, to have tie ins for
existing utility system & steam supplies & control interface with the
existing main control room.
BFPL
Shutdown Maintenance 2008 & On going Maintenance
works:
Burrup Fertilizers is one of the largest ammonia
plant in the world at Burrup Peninsula, Dampier, WA6713, Northwest of western
Australia. Allwin Engineering secured the major maintenance work during the
shutdown of the plant in 2008 and successfully completed.
During the planned maintenance work, Allwin
Engineering performed replacement of chemical dosing systems for Boiler feed
water, water treatment plants (replacing of acid & caustic storage tanks,
corroded piping & supports etc, )
The on going Maintenance
contract with BFPL started since 2005 & renewed for a further period of 5
years in 2008. This work involves regular day to day maintenance of the plant
as well as minor modification works in a brown field environment, to show the
capability of the company to execute the project in a running brown field environment.
Allwin Engineering Sdn Bhd has been awarded for the
construction of a Steel plant for Bensteel Sdn Bhd,
at Kertih, Terranganu
state, Malaysia.
Allwin Engineering Sdn Bhd has been awarded for the
construction of a BOPET, a down stream plastics & packaging manufacturing
unit for Benflex Sdn Bhd at Kertih, Terranganu state, Malaysia.