Mission and Values
  The company’s mission is to be one of the largest and most successful industrial contracting companies in the Far East Asia, to deliver sustainable value to its clients.........
 
   
 
Quality Assurance and Control
  Our Total Commitment to Quality :
At Allwin Engg, we are committed to maintaining and enhancing our reputation for delivering client satisfaction .......
 
 
Health, Safety, Environmental Preservation and Responsible Care
 
Occupational Health & Safety Policy :
We firmly believe the key to our success is to maintain the health and safety of everyone on our sites. .......
 
 

REFERENCES

 

Allwin Engineering Key Personals References from Middle East on Pre commissioning projects:

 

The Allwin Engineering key personals have done the below projects in Kingdom of Saudi Arabia. All the technical manpower within Allwin Engineering are qualified and experienced in Oil & Gas industry for years to assure best quality services to Australian and Far East Asian clients.

 

All the below contracts are with MMG Technical Services Division in Saudi Arabia which is a Service provider division of one of the largest Construction company in the Middle East

 

§  Aqua Milling cleaning of pipe spools & preservation for major de bottleneck project for  Saudi Chevron Phillips during Feb 2007, October 2007 –AYTB as the construction contractor.

 

§  Performed Pre commissioning activity for Samsung Saudi Arabia Ltd, for their project of EO / EG Plant at Sharq 3rd Expansion Project. Foster Wheeler is the FEED & EPC which includes Passivation of Cooling water system, Bolting & mechanical run check and preparation.

 

§  Chemical Cleaning of Oxygen lines for Jubail United Petrochemical company JUPC –EO EG plant II and Aqua milling cleaning of Oxygen import line from EG I.

 

§  Carried out Hydraulic Bolt torquing and tensioning requirements of the entire project, completed in schedule, maintained complete data base of the joints, ensuring joint integrity and Achieved ‘Zero’ % leak at two major projects for Jubail United Petrochemical Company –  SATEC -EO /EG Phase 2 and LINARCO – LAO Project

 

§  Successfully completed Columns modification job which includes retraying in 7 columns with Sulzer high performance trays and shut down jobs for Major Turn Around at Saudi Chevron Phillips, Jubail. during Feb 2007 with 42 engineering days based on the major columns modification works. This project is a part of the major modification and debottlenecking of existing old Aromax complex.

 

§  De contamination of the columns and vessels in Saudi Chevron Phillips during shut down Feb 2007, October 2007 reduces the gas freeing and release for maintenance 50% less time.

§  Chemical cleaning & Passivation of Cooling water lines for United LAO, Sharq –Samsung –3rd Expansion EG plant, Yansab EG Phase 1.

 

§  Pre commissioning works for Saudi Aramco  GOSP 1, Qatif Producing Facilities. As a Contractor for Pre Commissioning to Snamprogetti S. p. A. Milanese, Italy.

Planning and Work Package Preparation and the Pre commissioning work

Prepared Checklist & Forms for Precommissioning and Site acceptance and inspection for startup.

The GOSP 1 consists of Gas Oil Separation Plant, Water Oil Separation Plant, Water Injection Plant, Gas Gathering Plant and Utilities.

 

 

§  Provided Manpower assistance for commissioning and startup, Aqua milling, Chemical cleaning and maintenance requirements for Saudi Aramco Qatif facilities at Berri Gas PlantSulfur Recovery Units Expansion and  Modification Sub contractor for Technip Saudi Arabia Ltd.

 

§  Aqua Milling of big bore lines, Chemical Cleaning and Oil Flushing works of Lube oil circuit of WIP pumps and Gas compressors for Saudi Aramco Qatif facilities  GOSP 2 Qatif South as a Subcontractor for Arabian CBI Ltd.  

 

§  Completed Turnaround maintenance Job in January 2008 T/A for Safco IV –one of the world largest Ammonia Plant –Saudi Arabian Fertilizers Company, Jubail. KSA.

 

§  Completed Revalidation of Hi Flow rate gas well flow lines for Hawiyah and Kuff gas area for Saudi Aramco.

 

§  Shut down maintenance job at Saudi Aramco Riyadh Refinery -April 2005 for the plants LPG, Vise breaker, DGA, Sulfur, Desulphurization and Hydrogen plants.

 

§  Shut down maintenance job at Saudi Aramco Riyadh Refinery -Feb 2007 for the plants LPG, Vise breaker, DGA, Sulfur, Desulphurization and Hydrogen plants, with critical mile stone for about 40% tubes replacement for platformate heater –completed 2 days ahead of schedule on primary plan

 

§  Completed Turn around for Shedgum Gas plant for Saudi Aramco – Aug 2006.

 

§  Shut down maintenance job at Saudi Aramco Rastanura South Refinery -April 2004 for the 5 plants including Vise breaker, DGA, Sulfur, Desulphurization and Hydrogen plants. 

 

 

Barrup Fertilizers Pty Ltd . -          Barrup Peninsula, Karratha, WA

 

The Allwin Engineering performed Rigging and closure of Ammonia Converter, performed Bolt tensioning and Torque requirement of the project during construction of one of the biggest single train Ammonia plant in Burrup Peninsula, Western Australia.

 

The Performance and professional work of PSS bagged the long term Maintenance Contract from BFPL, which includes, General Mechanical, Electrical Maintenance works, Scaffolding, Coating and insulation works. This job is being carried out by another entity ATS AP Pty Ltd. -Owned and Managed by the same Management.

 

The Allwin Engineering performed maintenance and repair activity on an Emergency shutdown during April 2008, due to break down for 4 days.

 

The Allwin Engineering has been awarded with Total Turnaround Management for BFPL planned Major Shutdown and Allwin Engineering completed the shut down during June 2008

 

The ATS WA Pty Ltd, has been awarded for managing the emergency shutdown of the BFPL plant due the major broke down maintenance of the Main air compressor of the Ammonia plant.

 

Construction of New Desalination plant for Burrup Fertilizers, Dampier, WA 6713.

 

The New Desalination Plant will supply water to the plant replacing the water supply from Water Corporation with a capacity of 1500 M3  each skid per day capacity. The Desalination plant consists of 2 Nos skid mounted units, 3 nos of Booster pumps, MCC, PLC control systems supplied by Entropie SAS, France.

 

This is a brown field project, to have tie ins for existing utility system & steam supplies & control interface with the existing main control room.

 

BFPL Shutdown Maintenance 2008 & On going Maintenance works:

 

Burrup Fertilizers is one of the largest ammonia plant in the world at Burrup Peninsula, Dampier, WA6713, Northwest of western Australia. Allwin Engineering secured the major maintenance work during the shutdown of the plant in 2008 and successfully completed.

 

 

 

During the planned maintenance work, Allwin Engineering performed replacement of chemical dosing systems for Boiler feed water, water treatment plants (replacing of acid & caustic storage tanks, corroded piping & supports etc, )

 

The on going Maintenance contract with BFPL started since 2005 & renewed for a further period of 5 years in 2008. This work involves regular day to day maintenance of the plant as well as minor modification works in a brown field environment, to show the capability of the company to execute the project in a running brown field environment.

 

Allwin Engineering Sdn Bhd has been awarded for the construction of a Steel plant for Bensteel Sdn Bhd, at Kertih, Terranganu state, Malaysia.

 

Allwin Engineering Sdn Bhd has been awarded for the construction of a BOPET, a down stream plastics & packaging manufacturing unit for Benflex Sdn Bhd at Kertih, Terranganu state, Malaysia.

 

 
 
 
Home About Us Projects Services Regions Clients Sitemap Contact Us
Allwin Engineering Sdn Bhd © 2010 Powered by Theinf